Early in 2019 the Port Douglas and Daintree region experienced torrential rainfall. In one deluge receiving almost 500mm of rain in 24 hours, 300 of that in just six hours. The Daintree river level broke a 118-year record rising by almost a meter.
The Daintree Eco Lodge experienced flood waters through the main reception building. BH Electrics worked directly with the client for disaster recovery. First step was to isolate and make safe all electrical services.
We conducted a site assessment for the safety of staff and people on site. Re-energised areas that were unaffected and complied a full audit of electrical works required to bring it back to standard safely.
Electrical works included